Sign In | Join Free | My spintoband.com
China Beijing Zulin Formwork & Scaffolding Co., Ltd. logo
Beijing Zulin Formwork & Scaffolding Co., Ltd.
Beijing Zulin Formwork & Scaffolding Co., Ltd. ---Formwork and scaffolding solution
Verified Supplier

12 Years

Home > Climbing Formwork >

Single-side adjusted Climbing Formwork with high level of standardization and universality

Beijing Zulin Formwork & Scaffolding Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

Single-side adjusted Climbing Formwork with high level of standardization and universality

Model Number : DXB-180 & DXB-240

Place of Origin : Beijing, China (Mainland)

Brand Name : ZULIN

Certification : ISO9001-2008

Price : Negotiation

MOQ : One 20ft container

Delivery Time : After deposit 15-20 days

Payment Terms : T/T L/C (bank transfer)

Supply Ability : 100sets/day

Packaging Details : In bulk,pallet,bundle or according the customer demand

Contact Now

Single-side adjusted Climbing Formwork with high level of standardization and universality

Descrition:

Introduction


Single-side climbing formwork DXB-180 & DXB-240 are based on the DP-180 & DP-240 system,

which are in similar structure. DXB-180 & DXB-240 are mainly used in concrete pouring of dam, pier,

guy anchor, concrete protecting wall, tunnel, underground workshop and so on. Because the concrete

lateral pressure is entirely supported by anchor system and bracket, the wall-through tie-rods and

additional reinforcement are not needed. The construction is easy, rapid and economical; the surface

of the concrete is smooth. They are perfect formwork systems for single-sided walls.

DXB180

DXB240

The Adjustment Of Inclination(DXB-180 system can be inclined by adjusting pull-push prop.

The maximum angle is 30°)

Characteristics

1. The lateral pressure of the concrete is entirely supported by the anchor system. Hence, wall-through

tie-rods are not needed, and the finished concrete is perfect.
2. The formwork can move backward entirety, which will be convenient for work.
3.Couplings are used for connecting the formwork units to make sure they keep a straight line.
4. The connecting components have a high level of standardization and universality.
5. The formwork can stick to the concrete tightly, which means dislocation and leakage can be avoided.
6. The formwork can be adjusted horizontally or vertically whenever it is necessary.
7. DXB-180 system can be adjusted to lean forward or backward, and the maximum inclination is 30°.


Product Tags:

formwork design

      

foundation formwork

      
Wholesale Single-side adjusted Climbing Formwork with high level of standardization and universality from china suppliers

Single-side adjusted Climbing Formwork with high level of standardization and universality Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Beijing Zulin Formwork & Scaffolding Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0